top of page
![](https://static.wixstatic.com/media/8c6d98_1a3f2b4a6eef436ca9518b5da7b620c6~mv2.jpg/v1/fill/w_980,h_700,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/8c6d98_1a3f2b4a6eef436ca9518b5da7b620c6~mv2.jpg)
![](https://static.wixstatic.com/media/8c6d98_2c616400150e4d13b034da91157a5e39~mv2.jpg/v1/fill/w_980,h_534,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/8c6d98_2c616400150e4d13b034da91157a5e39~mv2.jpg)
![](https://static.wixstatic.com/media/8c6d98_8f605c6b3cac4c80adcca8384e462912~mv2.jpg/v1/fill/w_980,h_551,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/8c6d98_8f605c6b3cac4c80adcca8384e462912~mv2.jpg)
![](https://static.wixstatic.com/media/8c6d98_1a3f2b4a6eef436ca9518b5da7b620c6~mv2.jpg/v1/fill/w_980,h_700,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/8c6d98_1a3f2b4a6eef436ca9518b5da7b620c6~mv2.jpg)
1/8
West Wyong Urban Release Area
Proposed treatment for the riparian zone to create a lineal park as part of the new residential community on the NSW Central Coast.
Key principles are:
-
Preserve existing remnant vegetation to create an environmental corridor.
-
Slowing stormwater run off by creating a vegetated swale with rock scour protection in key locations to slow water flow prior to discharge into downstream water quality basins.
-
Create a sense of arrival into the new residential precinct.
-
Create informal access and seating areas across the corridor connecting proposed residential precincts.
-
To manage fuel loads to meet APZ requirements and achieve a low maintenance environment.
bottom of page